Orchestra Pit Construction, Part 4 - Video
The side walls of the pit are shored up while the concrete sets.
Work continues on the back wall of the orchestra pit.
See Part 1, Part 2, and Part 3
Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2
Labels: Opera House, Orchestra Pit, Renovation, Stage

0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home