What's New at Sarasota Opera?

Keep up-to-date with all that is going on at Sarasota Opera

Friday, September 28, 2007

Balcony Rebuild

The balcony before rebuilding began.


The first steel for the new seating is added at the back of the balcony.

All of the new steel in place.

A view of the white projection booth columns which will be removed in the next few months.

Labels: , , ,

Thursday, September 27, 2007

Plaster Work - Video


video

One of the construction crew prepares an area of plaster in the lobby for repair.

Labels: , , ,

Wednesday, September 26, 2007

Orchestra Pit, Part 1

In the photos below, the construction crew prepares to pour the concrete floor of the mechanical sub-pit of the Orchestra Pit, which will house the pit lift.



Labels: , ,

Tuesday, September 25, 2007

Balcony Steel

A construction worker installs steel supports for the new balcony decking on the 1926 balcony frame.

Labels: , ,

Monday, September 24, 2007

Hank and Suzanne Foster

Donors Hank and Suzanne Foster with Executive Director Susan T. Danis (center)
on a tour of the construction site.

Labels: , , ,

Friday, September 21, 2007

Second Floor Lobby, Part 2

The second Floor Lobby is beginning to take shape. See this post for a set of earlier photos.



Labels: , ,

Thursday, September 20, 2007

Hoist



Some air conditioning duct being hoisted up the atrium to the attic.

Labels: , ,

Wednesday, September 19, 2007

Windows

Tuesday, September 18, 2007

Roof Sequence Update

Here is an update to the earlier sequence of photos showing the exterior changes to the Opera House.

The rear roof (which is white) has been completed and front building is waiting for the skylight.

Most of the windows have been re-installed.

Labels: , , ,

Monday, September 17, 2007

Framing and Drywalling

Here are a few photos of wall framing going up and drywall being installed.



Labels: , ,

Friday, September 14, 2007

Work Overhead



Air conditioning duct being installed in the attic above the McCorkle Lounge.

Labels: , ,

Thursday, September 13, 2007

Lobby Work, Part 4

Framing and wiring in the lobby has progressed significantly since the earlier post showing the lobby progress.



Labels: , ,

Wednesday, September 12, 2007

Outside / Inside



To find out what this lift is doing,
scroll
down
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

Labels: , ,

Tuesday, September 11, 2007

McCorkle Lounge

The new third floor McCorkle Lounge under construction:

Labels: , ,

Monday, September 10, 2007

Digging

Here are a few photos of a backhoe in the theater.




Labels: , ,

Friday, September 7, 2007

Roof Work


Facilities Manager Chris Burtless during the skylight demolition

Food and Beverage Manager Jim Reid inspecting the work.

Labels: , , , , ,

Thursday, September 6, 2007

Balcony Demolition

Wednesday, September 5, 2007

Construction Still Life


Photo by Jennifer Berges

Labels: ,

Tuesday, September 4, 2007

Theater June 1 to August 28

As a continuation of the earlier post showing a sequence of photos of the theater demolition, here is an update showing the beginning of the orchestra pit construction.








Labels: , , ,