Stage Finishing


The new wood floor is laid on the stage.

The stage floor is ready for painting, as are the columns on either side of the stage.





See the construction of the stage in Part 1, Part 2, Part 3, and Part 4

Labels: , ,

Thursday, April 24, 2008

Proscenium Arch


Decorative columns are built on either side of the proscenium.










Over the course of a few weeks, the proscenium arch above the stage is built, including a slot in the center for the Surtitles screen.

Labels: , ,

Saturday, April 19, 2008

Rigging

As soon as the stage could support weight, steel crews began reinforcing the structure at the top of the flytower which supports all the scenery and lightign equipment hoisted above the stage.





Following the steel crew, a team began installing the rigging system, for raising and lowering the lights and scenery. Dozens and dozens of cables were run from the overhead steel down to the stage, ready to be tied to long batons on to which the equipment is mounted. (a few can be seen at the left of the above photo with yellow caps on the ends).

Workers in lifts install lights in the scenery bay while new rigging on the stage is tested in the background.

Labels: , ,

Tuesday, February 19, 2008

Pit and Stage






Lifts work throughout the theater as work begins on the freshly poured stage. Temporary supports for the stage can be seen in the orchestra pit.

Labels: , , ,

Thursday, February 7, 2008

Steel Work Above the Stage - Video




video

Large scaffolding is setup and moved around stage to work on reinforcing the steel structure above the stage. Rigging equipment which is used to life lights and scenery will be mounted off of the steel structure.

Labels: , ,

Thursday, January 31, 2008

The Stage, Part 4


Work progresses on the underside of the balcony.

The stage is poured. A temporary wood railing is in place at the edge of the new orchestra pit. A new stage trap can also be seen in the center of the stage.



See the construction of the stage in Part 1, Part 2, and Part 3

Labels: , ,

Monday, January 28, 2008

The Stage, Part 3




The construction crew works on laying the concrete form and rebar, viewed from the scenery bay.

See Part 1 and Part 2

Labels: , ,

Wednesday, January 23, 2008

The Stage, Part 2






The construction crew gets the form and rebar set for the pouring of the stage.

See Part 1

Labels: , ,

Thursday, January 17, 2008

The Stage, Part 1

The construction crew assembles a metal and wood form of the stage in preparation for the concrete pour.



See the post "Building the Orchestra Pit Walls" for links to all photos of the Orchestra pit Construction.

Labels: , ,

Monday, January 14, 2008

Building the Orchestra Pit Walls


Cinder blocks are brought into the pit to build the cross under hallway walls.







See Part 1, Part 2, Part 3, Part 4, Part 5, and Part 6 of the orchestra pit construction.

Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2


Labels: , , ,

Monday, January 7, 2008

Orchestra Pit Construction, Part 6






See Part 1, Part 2, Part 3, Part 4, and Part 5

Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2

Labels: , , ,

Thursday, January 3, 2008

Orchestra Pit Construction, Part 5




The walls and floor of the pit are finished and preparation begins for forming the stage.

See Part 1, Part 2, and Part 3, Part 4

Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2

Labels: , , ,

Wednesday, December 26, 2007

Digging Out the Pit - Video


video

The last of the pit is cleared out so the forming of the walls and floor can be completed.

Labels: , , ,

Wednesday, December 19, 2007

Orchestra Pit Construction, Part 4 - Video


The side walls of the pit are shored up while the concrete sets.

Work continues on the back wall of the orchestra pit.




See Part 1, Part 2, and Part 3


Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2

Labels: , , ,

Thursday, December 6, 2007

Orchestra Pit Construction, Part 3





As the front wall of the orchestra pit is completed and preparations begin for pouring the theater floor, work goes on finishing the rear walls and floor area of the pit.

See Part 1 and Part 2.

Also, see the photos of the excavation before the pit construction began:
Part 1
Part 2

Labels: , , ,

Wednesday, November 21, 2007

Orchestra Pit Construction Continued






The orchestra pit floor and outside walls are finalized.

Labels: , , ,

Monday, November 19, 2007

Orchestra Pit Costruction


The rear area of the pit, which will eventually be covered over by the new stage, begins to take shape.

Labels: , , ,

Monday, November 12, 2007

Excavating Under the Stage, Part 2

A backhoe works its way out of the theater, as excavation of the rear of the orchestra pit is completed.

See Part 1.

Labels: , , ,

Wednesday, October 24, 2007

Excavating Under the Stage, Part 1

video

The construction crew begins excavating the back area of the orchestra pit, which will extend under the new stage.

Labels: , , ,

Wednesday, September 12, 2007

Outside / Inside



To find out what this lift is doing,
scroll
down
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

Labels: , ,

Tuesday, July 31, 2007

Stage Demolition, Part 3


The re-bar and concrete of the stage is deposited in the lot behind the Opera.


Bare dirt in the theater!


View from the scenery bay looking at where the stage used to be.




From stage, looking into the scenery bay (The auditorium is out of frame to the left).

Labels: , , ,

Monday, July 30, 2007

Stage Demolition, Part 2

Friday, July 27, 2007

Stage Demolition, Part 1

During August, work will begin on the rebuilding of the orchestra pit. This is the first of three posts recapping the demolition of the stage over the last few months. As always, click on each photo for a larger version. enjoy!